Air Conditioning Installation Questions

Every question we get asked about air conditioning installation, answered straight.

Questions

How It Works

  • Why does Denver’s altitude affect AC sizing?

    At 5,280 feet, air is less dense, so a unit rated at sea level moves less heat than its nameplate suggests. A Manual J calculation corrected for altitude accounts for this. Skipping that step typically results in a system that runs continuously on hot days and still can’t reach the set temperature.

  • Do I need a permit to install a new AC in Denver?

    Yes. Denver and most surrounding municipalities require a mechanical permit for new AC installations. We identify the specific permit needed for your address and handle the application as part of the job scope. An unpermitted installation can create problems at resale and may void the equipment warranty.

  • What happens if I delay replacing an aging AC unit?

    An undersized or failing unit running through a Colorado summer puts increasing strain on the compressor. Compressor failure typically costs more to repair than a planned replacement, and you lose cooling mid-season when demand on installers is highest and lead times are longest.

  • How long does a residential AC installation take?

    A standard central AC replacement typically takes one day once permits are in hand. New construction or installations requiring significant ductwork modifications take longer. Your written estimate will include a timeline specific to your job before anything is scheduled.

  • What does the post-install check actually confirm?

    The technician measures supply and return airflow at each register, verifies refrigerant charge against manufacturer spec, and calibrates the thermostat. If any reading falls outside the acceptable range, it is corrected before the job is closed. You receive a written record of the results.

  • Can I install a mini-split instead of a central system?

    Yes. Ductless mini-splits are a practical option for homes without existing ductwork, room additions, or spaces where extending ducts is not cost-effective. The same altitude-adjusted sizing process applies, and permits are still required for the refrigerant and electrical work.

Tell Us What Is Going On

Every enquiry starts with a system evaluation and an itemized written estimate covering equipment, installation scope, and timeline.